AQW 53004/22-27 Written question to the Minister for Infrastructure

To ask the Minister for Infrastructure for an update on the Sixmilewater River feasibility study, including whether it will be completed in the 2022-27 Assembly mandate.

Asked by John Blair MLA on 25 September 2026

  • Answered
  • Written
  • After due date
Tabled
25 September 2026
Answer due by
12 October 2026
Answered
13 October 202618 days after tabling
Department
Department for Infrastructure
Priority question
No

Answer

The feasibility study into the Antrim Significant Flood Risk Area, which includes the lower reaches of the Sixmilewater River, remains ongoing. Work is continuing to explore every reasonable opportunity to identify a viable flood alleviation scheme for Antrim, including further hydraulic modelling, engineering assessment and the consideration of combinations of flood alleviation measures.

The feasibility study is expected to be completed early in 2027, within the current Assembly mandate.