AQO 2502/17-22 Oral question to the Minister for Infrastructure
To ask the Minister for Infrastructure whether there is an opportunity to extend the Glider route beyond the route proposed in the Belfast Rapid Transit Phase 2 consultation.
Asked by John Blair MLA on 23 September 2021
- Answered
- Oral
- Tabled
- 23 September 2021
- Answer due by
- 4 October 2021
- Answered
- 4 October 202111 days after tabling
- Department
- Department for Infrastructure
- Priority question
- No
Answer
I was pleased to launch a 10 week public consultation on 26th July for a proposed north- south Belfast Rapid Transit network extension. The routes identified in the public consultation are based on analysis carried out by specialist transport consultants and represent the current most viable options to build on the success of the Glider service.
At this stage no decisions regarding a preferred route have been taken and all feedback received from the public consultation, including suggested extensions, will be carefully considered. In light of these considerations a public consultation report will be produced detailing feedback received, responses to that feedback and confirmation of the preferred routes.
The closing date for consultation responses is today.