AQW 29810/22-27 Written question to the Minister for Infrastructure

To ask the Minister for Infrastructure whether her Department has been made aware of any rail traffic issues on the Bleach Green line, between Antrim and Belfast.

Asked by John Blair MLA on 3 July 2025

  • Answered
  • Written
Tabled
3 July 2025
Answer due by
22 July 2025
Answered
10 July 20257 days after tabling
Department
Department for Infrastructure
Priority question
No

Answer

This issue is an operational matter for Translink. I have sought the requested information and have been advised as follows:

There was some rail disruption during the month of June on the section of railway line between Antrim and Belfast. This was mainly due to factors outside of Translink’s control, specifically linked to civil disturbances in Coleraine on 11th June and two occasions on 17th and 23rd June, when 3rd party road vehicles came in contact with railway bridges in the Antrim area causing temporary closures of the line whilst the bridges were subject to safety assessment..

For any future queries relating to operational matters, you should contact Translink directly at aqw.request@translink.co.uk. Making direct contact with Translink will ensure that you receive the information in the shortest possible timeframe and make best use of limited public resources.

Official sources