AQW 29811/22-27 Written question to the Minister for Infrastructure

To ask the Minister for Infrastructure whether her Department has considered signalling or dualling upgrades to the Bleach Green line, to manage extra demand in light of the Knockmore line feasibility study.

Asked by John Blair MLA on 3 July 2025

  • Answered
  • Written
Tabled
3 July 2025
Answer due by
22 July 2025
Answered
10 July 20257 days after tabling
Department
Department for Infrastructure
Priority question
No

Answer

The feasibility studies arising from the All -Island Strategic Rail Review (AISRR) have taken cognisance of the wider rail network, including infrastructure constraints and opportunities for lines to be reopened in conjunction with enhancements elsewhere on the network. It is anticipated that re-opening the Antrim to Lisburn line will require installation of passing loops on this single line section. Further dualling or an additional passing loop may also be required on the Antrim to Bleach Green line, dependent on the future operating model.

Official sources